QA/QC procedure


All components are quality controlled in 4 phases:

1. Exit control at the subcontractor is performed by an Envotherm employee.
2. Entry control at Envotherm before assembly is performed by an Envotherm employee.
3. The functionality test at Envotherm takes place the last 14 days prior to the delivery date, where all the components’ functions are tested.
4. Exit/end control at Envotherm is a visual inspection and documentation of the machine before packaging and shipping.

Subcontractors of standard components for Envotherm are submitted to EN-ISO 9001.
• QA/QC procedure: All components are quality controlled in 3 phases.

1. Visual entry control.
2. The functionality test at Envotherm takes place the last 14 days prior to the delivery date, where all the components’ functions are tested.
3. Exit/end control at Envotherm is a visual inspection and documentation of the machine before packaging and shipping.